PEPconnect

ADVIA® Chemistry XPT System Daily and Weekly Maintenance Online Training

Perform daily and weekly maintenances tasks on the ADVIA® Chemistry XPT System. This clinical laboratory training qualifies for continuing education units (CEU).

欢迎参加VB22 MI Applications在线培训。 在此次培训中,您将了解​SPECT/CT和SPECT系统VB22软件版本提供的新功能和增强功能。  请注意:这些增强功能按照不同的感兴趣区进行了归纳整理。您可以在“目录”区域中直接导航到您需要的设备。 Welcome to ADVIA® Chemistry XPT System Daily and Weekly Maintenance Online Training course.  In this course, you will learn how to maintain the ADVIA Chemistry XPT System to ensure optimal system performance. Select Next to continue.   Describe how to navigate the maintenance workspace List the steps to perform Daily Maintenance List the steps to perform Weekly Maintenance Upon successful completion of this course, you will be able to: Select Next to continue. Congratulations. You have completed the ADVIA Chemistry XPT Daily/Weekly Maintenance online training course. Listed below are the key points that have been presented.  Take time to review the material before you proceed to the final quiz.  Describe how to navigate the maintenance workspace The Maintenance workspace contains several tabs to assist the operator in completing maintenance tasks efficiently including: Schedule Lamp Energy Cuvette Blank ISE Operations The maintenance Log records all maintenance activities up to 10,000 entries and can be exported. Daily Maintenance In addition to the Daily System Operation tasks; Daily Maintenance consists of performing the startup and shutdown washes.  The daily startup wash rinses the probe lines, reaction cuvettes, and dilution cuvettes.  The system aspirates deionized water for the startup wash.   Startup Wash Procedure Select System Operations > Wash > Startup Wash     Select Perform > OK   Note: The startup wash takes 27 minutes to complete The daily shutdown wash uses a detergent to clean the probe lines, reaction and dilution cuvettes and ISE components.    Shutdown Wash Procedure Ensure all reagents are available Select System Operations > Wash > Shutdown Wash Enter 2 in the Cycles field Select Perform > OK Note: The shutdown wash takes 40 minutes to complete. List the steps to perform weekly maintenance Weekly maintenance : Check lamp energy and check lamp coolant level Measure cuvette blanks Wipe condensation from the reagent and CTT tray compartments Perform weekly wash including WUD/DWUD wash Select Next to continue. 要运行Cardiac Dot Engine,需要满足以下先决条件: ·       将ECG电极正确连接到患者身上 ·       正确执行ECG学习阶段 ·       成功登记患者  ·       正确的患者方位(头先进/足先进)  ·       患者显示已打开。 在患者显示中,您可以选择常规参数、屏气参数和生理参数。要完成患者显示,点击绿色的执行按钮,以转向第一个程序步骤:扫描定位像。 要了解更多关于参数设置或执行ECG学习阶段的信息,请点击以下选项卡。 The Maintenance workspace contains several tabs to assist the operator in completing maintenance tasks efficiently including: Schedule Lamp Energy Cuvette Blank ISE Operations The maintenance Log records all maintenance activities up to 10,000 entries and can be exported to a CD or USB drive. Maintenance workspace Learn about the Maintenance workspace. Instructions:If media does not automatically start, select the play arrow to begin.Flash File:/content/generator/Course_90010936/sim_AXPT_Maintenance_800x600_HTML5_9/sim_AXPT_Maintenance_800x600_HTML5_9.swfHTML5 File:/content/generator/Course_90010936/sim_AXPT_Maintenance_800x600_HTML5_9/index.htmlPDF File: 胸腔全貌步骤会自动开始,您需要在参考图像中定位冠状面和横断面断层。 与上一个步骤一样,如果您在定位断层时需要帮助,Cardiac Dot Engine会在指导视图中显示一张示例图像。请观看视频了解如何执行胸腔全貌步骤。 完成扫描后,胸腔全貌图像显示在GSP中。 In addition to the Daily System Operation tasks; Daily Maintenance consists of performing the startup and shutdown washes.    The daily startup wash rinses the probe lines, reaction cuvettes, and dilution cuvettes.  The system aspirates deionized water for the startup wash. Startup Wash Procedure Select System Operations > Wash > Startup Wash     Select Perform > OK   Note: The startup wash takes 27 minutes to complete   The daily shutdown wash uses a detergent to clean the probe lines, reaction and dilution cuvettes and ISE components. Shutdown Wash Procedure Ensure all reagents are available Select System Operations > Wash > Shutdown Wash Enter 2 in the Cycles field Select Perform > OK Note: The shutdown wash takes 40 minutes to complete.  Select Next to continue. Weekly maintenance : Check lamp energy Check lamp coolant level Measure cuvette blanks Wipe condensation from the reagent and CTT tray compartments Perform weekly wash including WUD/DWUD wash   Weekly Maintenance Learn how to perform weekly maintenance. Tab TitleTextCheck Lamp Energy Check Lamp Energy Select Maintenance > Lamp Energy Select Start Lamp Energy Select OK to verify the RTT1 Water Position and Container Print and store data Select Close to exit the Lamp Energy Measurement window Select System Operations > Initialize Check Lamp Coolant Check Lamp Coolant Release and pull the PC tray forward Open the top right cover Push and release the middle right cover to gain access to the lamp coolant reservoir Check that the fluid level is between the Fill and Full lines If fluid is needed, remove the coolant cover and fill reservoir to the 9-cm mark with 5% lamp coolant Replace reservoir cover and close all system covers Note: A 5% solution of lamp coolant is made by mixing 50mL of Lamp Coolant Additive with 1 liter of deionized water. Measure Cuvette Blanks Measure Cuvette Blanks Select Maintenance > Cuvette Blank > Start Cuvette Blank Select Yes Note: The Cuvette Blank process is approximately 15 minutes Select View to display cuvette statistics Select Abnormal List to evaluate results There are 20 cuvette sets with 17 cuvette cells in each set. Replace cuvette sets when 4 or more cells in a set are abnormal. Select Close > Close Select Accept CB Results Wipe Condensation from CTT  If the media does not automatically start, select the play arrow to begin. Wipe Condensation from RTTs Wipe Condensation from RTT 1 & RTT2 Turn system off Open right top cover Remove RTT1 tray cover Remove the reagent tray loader; turn the white knob counterclockwise Lift loader out of refrigerated housing Using lint-free cloth, wipe the interior of the housing and clean the glass window of the reagent barcode reader Reinstall the reagent tray loader Repeat the procedure for RTT2 Perform Weekly Wash Weekly Wash Procedure The daily shutdown wash is not required on the day the weekly wash is performed. Ensure the wash solutions are in the correct locations Select System Operations > Wash > Shutdown Wash Ensure Wash Station under Settings is ON Enter 2 in the Cycles field Select Perform > OK Note: The weekly wash takes approximately 1 hour to complete. When complete, select the X in the upper-right corner to close the window and continue.

  • ADVIA
  • chemistry
  • XPT