PEPconnect

Daily Maintenance Job Aid

This job aid provides instructions on how to perform daily maintenance on the ADVIA® Chemistry XPT system.

Daily Maintenance Daily Maintenance SIEMENS ADMIN 1 READY (CK to se;lice Samples or Reagenon.) 1. Select Maintenance > Schedule to locate Ceonder the daily maintenance tasks and Schudde Leg maintenance procedures Derdue 0| Fales 0 2 • Inspect, and clean if needed, probes, mix Adly Canpatel rods, wash mechanisms, wash cups and ISE Diation Book and Hordes . CJese Pratidel splash covers Fangents and System Solutionm . Jespect Every 1 com • Check and replenish reagents, system Entry 1 corp and ISE solutions Pamp Leaks - Inspect • Inspect pumps and WUD/DWUD nozzles Lamp Colort Lewd - Jespect 3/23/2004 12 3400 AM Rangent Tray Condensation - Remove Bury 1 cm • Perform startup wash CHl Como Trey Condensation . Emnave Every 1 days 5/23/2004 12:2400 AM • Perform shutdown wash Satdown Wid -Perform • Backup system files. System 5/23/2004 82:30:00 AM automatically completes this function Drain Vacwars Tank Fildry at 7:00:00 AM 5/23/2064 7:00:00 AM daily. Put 2. Select the Completed details button to log each completed maintenance task ? Note: Navigate to the Maintenance > Log tab to review completed maintenance tasks. Comments can be added to activities and the log can be printed or exported. Daily Maintenance HILS00001312 Effective Date: 12/22/2014

  • chem
  • maint
  • startup
  • shutdown
  • wash