PEPconnect

Periodic Maintenance Job Aid

This job aid provides instructions on how to perform periodic maintenance on the ADVIA® Chemistry XPT system.

Periodic Maintenance Periodic Maintenance 1. Select Maintenance > Schedule to locate the Periodic maintenance tasks and maintenance procedures Every 2 months • Clean dilution tray cuvettes • Clean and replenish the cuvette condition bottle Every 3 months • Wash the ISE electrode lines • Replace ISE electrode(s) Every 4 months • Clean the ancillary reagent bottle filters • Replace the reaction and dilution cuvettes • Clean the pure water bottle and filters 2. Select the Completed details button to log each completed maintenance task Note: Navigate to the Maintenance > Log tab to review completed maintenance tasks. Comments can be added to activities and the log can be printed or exported. Periodic Maintenance HILS00001312 Effective Date: 12/22/2014

  • chem
  • maint
  • dilution tray cuvettes
  • cuvette condition bottle
  • ISE electodes
  • ancillary reagent bottle
  • reaction cuvettes
  • dilution cuvettes