PEPconnect

Weekly Maintenance Job Aid

This job aid provides instructions on how to perform weekly maintenance on the ADVIA® Chemistry XPT system.

Weekly Maintenance Weekly Maintenance 1 READY (OK to replace Samples or Reagents.] 1. Select Maintenance > Schedule to locate the Vil 80 weekly maintenance tasks and maintenance Schedule Log Lamy tony St Operarios procedures Fed enit Overde: 0 |Failed# Pofare • Check lamp coolant and perform lamp energy Interval Achilty Oser DetrCemet Couvre 2 check Date and Time Monday at 7:00:00 AM. - Perform cuvette blank measurement Dute and Time Weekly ist . Perfore 100 AM /21/2014 7:00:00 AM • Date and Time Wednesday at 7:00:00 AM 5/28/2014 7:00:00 AM • Wipe excessive condensation from the reagent and CTT tray compartments Duts and Time Wednesday at 7:00:00 AM 5/28/2014 7:00:00 AM - Date and Time Every month • Perform weekly wash including WUD/DWUD wash Date and Time Ivey tooth 6/1/2214 12:00:00 AM Date and Time Fan Fesers - Cash Every ! mon thi 2. Select the Completed details button to log each completed maintenance task DUation Tuy Crrettes . Ora Every month 611/2214 12:00:00 AM Date and Time Cuvette Condi Saber Boutle - Conan Every month Note: Navigate to the Maintenance > Log tab to Date and Time Every month review completed maintenance tasks. Comments DE Ororode Anembly Deterpret Mach . Peroes can be added to activities and the log can be printed or exported. ? HILS00001312 Effective Date: 12/22/2014 Weekly Maintenance – Perform Lamp Energy SIEMENS - 1710001 Check READY (OK to replace Samples or Reagents.] 1 1. Select Maintenance > Lamp Energy 2. Select Start Lamp Energy 3. On the Lamp Energy window, ensure the RTT1 container at position 60 is filled with DI water. Lamp Energy 3 4. Note: The default container is 70mL Brown. Change if 70mL white container is used. 5. Select OK 4 Cincel 6. Print and store data ......... Note: If the lamp or a cuvette segment was replaced, select Register Data > OK 5 2 ? HILS00001312 Effective Date: 12/22/2014 Weekly Maintenance – Perform Cuvette Blank Measurement 1. Select Maintenance > Cuvette Blank 2. Select Start Cuvette Blank 3. Select Yes to confirm 4. Highlight the completed result 5. Select View for cuvette statistics to display 6. Select Abnormal List from the bottom of the screen 7. Evaluate the results Note: Replace cuvette sets when 4 or more cells in a set are abnormal. 1. Select Close, then Close again 2. Select Accept CB Results to accept the completed results ..... 3. Select Confirm? > Yes HILS00001312 Effective Date: 12/22/2014

  • chem
  • maint
  • lamp coolant
  • lamp energy
  • cuvette blank
  • wash