PEPconnect

Aptio® Automation (Siemens) Competency Checklist

Education resource material designed to document competency mastery on-the-job. This Competency Checklist represents all learning objectives for this training area.
 

Aptio® Automation (Siemens) Competency Checklist Once an employee has acquired the necessary knowledge and skills to perform basic operation tasks this checklist can be used to observe the employee perform the required tasks for their core job responsibilities and to document demonstrated competency. The observer places their initials and date beside the task when it is performed successfully. Successful completion for each task is determined by the facility. The standards used to evaluate can be documented in the “Criteria” section below. Use the area on the last page to record comments or areas of improvement. If necessary, the observer can record recommended next steps of action for areas of improvement or development opportunities. When all required tasks are completed, the supervisor and employee sign and date this document as a record of completion. Criteria - Standards for successful completion of each task (e.g. Accuracy, Time, Quality, etc.): Observer’s Initials and Completion Date Topic/Tasks System Overview Identify system components and their function Distinguish between the safety labels Identify key areas of the user interface Sample Processing Identify sample requirements Load and unload samples from the I/O Module Describe the sample processing sequence Search for samples in the database Deliver a sample to the I/O Module Daily and Weekly Maintenance Perform Daily Maintenance Perform Weekly Maintenance Monthly and As Needed Maintenance Perform Monthly Maintenance Perform As Needed Maintenance Troubleshooting Describe analyzer and module statuses including warnings and errors Identify the areas of the Exceptions screen Utilize guided error recovery Manage samples in Priority Output Perform a controlled power shutdown and startup Describe the steps to perform an emergency power shutdown Quality # HILS1882 Effective Date: 06/09/2017 Page 1 of 2 SIEMENS siemens.com/healthineers Healthineers Aptio® Automation (Siemens) Competency Checklist Comments Areas of Improvement Next Steps  Primary Operator  Secondary Operator has been trained on the above documented tasks Supervisor: Employee: Date: Quality # HILS1882 Effective Date: 06/09/2017 Page 2 of 2 SIEMENS siemens.com/healthineers Healthineers

  • aptio
  • automation
  • siemens
  • semens
  • seimens
  • competency
  • training
  • mentor
  • checklist
  • consolidated