PEPconnect

Aptio® Automation (Siemens) As Needed Maintenance Job Aid

This job aid provides instructions on how to perform as needed maintenance.
Note: This training is designed for systems which include "APT" in the serial number but does not include the letter "C".  If your system serial number includes "APT" and the letter "C" or “AP2”, please select the Aptio Automation (Inpeco) training area.
 

As Needed Maintenance Clean the following modules with 10% bleach and lint-free cloth as needed: Rack Input worktable • Rack Output worktable • Bulk Input worktable • Bulk Input hopper • Check sample carrier integrity 1. Ensure all sample carrier on the system are empty 2. Shut down the system 3. Visually inspect the sample carriers for damage 4. Check that the fingers can hold a sample tube securely 5. If a sample carrier is damaged remove it from the track Supplies needed: ! Observe all warnings and cautions stated in the Lint-free cloth Aptio™ Automation Operator's guide. 10% bleach solution HILS781 Effective Date: 02/03/2014 As Needed Maintenance Replace the foil reel on the Sealer Module 1. Bring module off-line by selecting Going Off-line 2. Pause the system and ensure that all belts have stopped before proceeding. 3. Home the sealing head 4. Prepare module for foil loading 5. Replace the foil reel 6. Aptio™ system will cut ten foil pieces, ensure that all foil debris is cleared to prevent carrier misreads 7. Start the system 8. Reset the reel count 9. Bring on-line Refer to the Aptio™ Automation Operator’s Guide, Preventative Maintenance when performing this procedure. Supplies needed: ! Observe all warnings and cautions stated in the Foil Reel Aptio™ Automation Operator's guide. HILS781 Effective Date: 02/03/2014

  • track
  • aption
  • automaton
  • maint