PEPconnect

BCS® XP System Competency Checklist

Education resource material designed to document competency mastery on-the-job.  This Competency Checklist represents all learning objectives for this training area.

BCS® XP System Competency Checklist Once an employee has acquired the necessary knowledge and skills to perform basic operation tasks this checklist can be used to observe the employee perform the required tasks for their core job responsibilities and to document demonstrated competency. The observer places their initials and date beside the task when it is performed successfully. Successful completion for each task is determined by the facility. The standards used to evaluate can be documented in the “Criteria” section below. Use the area on the last page to record comments or areas of improvement. If necessary, the observer can record recommended next steps of action for areas of improvement or development opportunities. When all required tasks are completed, the supervisor and employee sign and date this document as a record of completion. Criteria - Standards for successful completion of each task (e.g. Accuracy, Time, Quality, etc.): Observer’s Initials and Completion Date Topic/Tasks System Overview Identify the key components of the BCS® XP System Identify the functions of the BCS® XP System components Demonstrate how to use Windows XP to open the BCS® XP System software and support programs Identify important features of the BCS® XP System software Reagent Management Identify key areas of the Lot Info dialog box Identify key areas of the Reagent Overview menu Load reagents onto the analyzer Sample Processing Process routine samples Add a test, determine if the result is ready and repeat a test Process STAT samples Maintenance Perform daily maintenance tasks Perform weekly maintenance tasks Perform monthly maintenance tasks Perform quarterly and every six month maintenance tasks Quality # HILS1905 Effective Date: 06/09/2017 Page 1 of 2 SIEMENS siemens.com/healthineers Healthineers BCS® XP System Competency Checklist Comments Areas of Improvement Next Steps  Primary Operator  Secondary Operator has been trained on the above documented tasks Supervisor: Employee: Date: Quality # HILS1905 Effective Date: 06/09/2017 Page 2 of 2 SIEMENS siemens.com/healthineers Healthineers

  • bcx
  • hemostasis