PEPconnect

Inspecting and Emptying the Water Trap on the Atellica® IM Analyzer Video Version 1.25 and Below

This video provides instructions on how to perform the weekly maintenance task of inspecting and emptying the water trap on the Atellica® IM Analyzer.

SIEMENS Build 1.7.o SIEMENS Build 1.7.0 Subsystems Samplies Samples Inventory Calibration Patient Orders PatÉnt Or&rs Worklist Maintenance Status Setup System Scheduled Report Logs Log Diagnostics Diagnostic Name Data Restore Software Updates Copy Configuration Seatup Status Logs Operator Diagnostics About PEPconnect PI -06 Filter Failter Module. All Frequency: All Time: Next 24 hours Performed By: All Module: All Frequency: All Time: Next 24 hours Performed By: All DL-P1-07 c-P1-06 c-P1-D6 Module All Module Perform„ Performn Module Activity Scheduled Fri-14 Sat-15 Mon-17 Sun-16 Tue-18 Wed-19 Thu-20 Diagnostic Name Diagnostkc Name Description Subsystems Diagnostics Description Frequency All 1M Autocheck Mark as Completed Move all module cornponents to their primary positrons. Move all module cornponents to their primary positions. Move all rnodule comnponents to their primary positions. All Initialize Module Move all module components to their primary positions. Move all module components to their primaty positions. Time Next 24 hours p p_lA-O I Cleaning the Exterior of Reagent Probes Cleaning the Exterior of the Aspirate Probes 4/13/2017 4/18/2017 3:00 Not Perform___ Clear TherrnalS Clear Therrnats Clear Therrna,ls Clear system thermal components 10110vving a thermal error that caused components to go offline. Clear system thermal components 101bvving a thermal error that caused components to go offline. Clear system thermal components 101b0vving a thermal error that caused components to go offline. Clear system thermal components 10110wing a thermal error that caused components to go offline. N/A Clear Therrnals Clear Thermnals Clear Thermals Clear system thermal components following a thermal error that caused components to go o Performed BV All pp_lA-Ol Cleaning the Water Container 5/17/2017 9:59 4/18/2017 Initialize Reagent Loader Return the lumient comeertment and the associated subsystems to the starting positions. Return the lumient comeartmert and the associated subsystems to the starting positions. Return the reagent lompadtmert and the associated subsystems to the starting positions. Procedure Details Reagent Loader Reagent Probes Cuvette Loader Initialize Reagente Loader Initialize Cuvgette Loader Initialize Reagent Coarer Return the reagent loader and the associated subsystems to the starting positions. Search Text Enter the activity name. pp_lA-Ol Inspecting and Emptying the 1M Water Trap Inspecting and Emptying the 1M Dryer Trap 4/18/2017 Prime Cuvettes Cuvette conveyor moves to fill the vertical cuvette chute with cuvettes. Cuvette conveyor moves to the vertical cuvette chute with cuvettes. Cuvette Loader Empty all Reagent Packs Empty' all Reagent Packs Empty all Reagent Packs from system for troubleshooting purposes. EditNiew___ Edit,'View___ Scheduled by Operator Inspecting and Emptying the 1M Water Trap Initialze Cuvette Loader Move the incubetton loader and the associated subsystem comnponents to their primary positions. Move the incuvetten loader and the associated subsystem cornponents to their prirnary positions. Move the incuvetten loader and the associated subsystem comnponents to their prirnary positions. Move the incuvetten loader and the associated subsystem comnponents to their primary positions. Move the incubation ringer and the associated subsystem components to their primary postttons. Incubation Ring Prime Cuvettes Cuvette conveyor moves to fill the vertical cuvette chute with cuvettes_ Cuvette conveyor moves to fill the vertical cuvette chute With cuvettes_ Scheduled Automatically Database Backup 4/18/2017 3:00 Scheduled by Service Empty all the cuvettes from the incubation ring. Empty Ring Luminometer DL-P1-07 DL-P1-07 Autocheck for DL Empty and Fill Ring Simultaneously empty the cuvettes from the incubation ring and load the ring with new cuvettes. Failter Reagent Compartment Empty Ring Empty all the cuvettes from the incubation ring. Database: Optimizing 4/13/2017 3:00 4/18/2017 3:00 Initialize Incubation Ring Initialze Incubation Ring Move the incubation ring and the associated subsystem components to their primary postttons. Reagent Probes Reagent Probe 1 Empty and Fill Ring Empty' and Fill Ring Simultaneously empty the cuvettes from the incubation ring and load the ring with new cuvel Database: Archiving and Deleting 4/13/2017 Initialize Luminometer Sample Probe Initialize Incubation Ring Move the incuvetten loader and the associated subsystem components to their primary positiors. Move the incubetton loader and the associated subsystem comnponents to their primary positions. Move the incuvetten loader and the associated subsystem cornponents to their prirnary positions. Completed p p _IA-O I 1M Daikly Maintenance Daily Maintenance Initialize Reagent Compartment Tip Loader UI OPERATORDIAGNOSTICS SUBSYSTEM LUMINOMETER ACTIVITY DARKCOUNTWlTHCUVETTE8 UI OPERATORDIAGNOSTICS SUBSYSTEM LUMINOMETER ACTIVITY DARKCOUNT UI OPERATORDIAGNOSTICS SUBSYSTEM LUMINOMETER ACTIVITY DARKCOUNTWlTHCUVETTE8 OPERATORDIAGNOSTICS SUBSYSTEM LUMINOMETER ACTIVITY DARKCOUNT Not Performed_ Not Perform___ 1M Daikly Maintenance Wash Ring Status p p_lA-O I 5/1/2017 TOO Parameters Module Covers Reagent Probe 1 Reagent Loader 5/17/2017 9:59 Enter Diagnostics State Exit Diagnostics State Turn Mechanics Off Add Activity Add Activity__ Set Warning___ PEP LabManager Monday, April 17, 2017 10:04 AM Thursday, June 08, 2017 AM

  • attelica
  • attellica
  • atelica