PEPconnect

Syva® Viva-ProE™ System Quaterly Maintenance Job Aid

This job aid provides instructions on how to perform quarterly maintenance on the Syva® Viva-ProE™ System.

Quarterly Maintenance Replace the Drying Block From the Home screen select the Tasks icon 1. Select the Maintenance tab 2. Remove the cuvette rotor cover 6 3. Select Replace Drying Block on the left side of the 2 screen 4. Select again Replace Drying Block on the right side 5 of the screen 5. Disconnect the tubing [2] from the front end of the drying block and move aside 6. Loosen the Block Screw [1] and lift off the Block [6] over the drying block (screw can remain inside the Block) 7. Remove the Drying Block [3] by pulling it up and to the right. Replace with a new one 4 3 8. Reinstall the Block [6] with the block screw but do not tighten the screw OYD 9. Select Continue in the software 10.Tighten the screw and reattach the tubing [2] to the drying block 11.Select Continue in the software 12.Select the Reset icon to reset the system and return to a stand-by state 13.Replace the cuvette rotor cover HILS#705 Effective date 06/01/2016 © Siemens Healthcare Diagnostics Inc. 2016 All rights reserved. Quarterly © Siemens AG 2013. All rights reserved. Maintenance

  • Pro E
  • Pro-E
  • VivaProE
  • VivaPro E
  • Viva ProE
  • VivaPro-E
  • Viva E
  • VivaE
  • Viva-E
  • DOA
  • DOA Testing
  • Drugs of Abuse Testing
  • drying block
  • tubing
  • block