PEPconnect

Performing a Urinalysis Quality Control Test Job Aid

This job aid provides instructions on how to perform a Quality Control test for urinalysis on your CLINITEK Status®+ Analyzer, including preparing the QC sample material and running QC on the system.

Urinalysis Quality Control Preparing Quality Control Performing Quality Control (Connect System) 1. Add 12 mL distilled or DI H20 into an 1. Select QC Test appropriately labeled tube • Prepare a Positive and Negative control 2. Select QC Strip Test 2. Remove a Chek-Stix® control test strip 3. Select Last Operator or Enter New Operator ID • Use the touchscreen to enter the information 3. Place the control test trip into the appropriate and select Enter to continue tube 4. Select Use Last Lot or Enter new lot and 4. Cap the tube and invert gently for 2 minutes expiration 5. Allow the tube to stand for 30 minutes • Enter the lot information using the touchscreen and select Enter to continue 6. Invert the tube 1 more time 5. Enter the lot information for the test strip to test 7. Uncap the tube and discard the control strip the controls per laboratory procedure • Enter the lot information using the touchscreen 8. Repeat steps for the other control and select Enter to continue 6. Select START • Dip the test strip into the control solution • Place the test strip in the table channel, pads facing up. Slide the strip to the end of the channel • Test stable will automatically pull in strip 7. Remove and dispose the test cassette per laboratory procedure 8. Repeat for the other control GPE15004.033 Effective Date: 02/14/2014

  • urinalysis
  • QC
  • Quality Control
  • job aid
  • Chek-Stix