PEPconnect

Replacing IMT Pump Tubing Video

This video provides instructions on how to replace IMT pump tubing on the Dimension® Systems.

The IMT pump tubing is replaced monthly to compensate for wearing and stretching. With the instrument in standby, press pause to stop the sampling system. Raise the IMT lid. From the operating menu, press F for system prep. F3 IMT. F3 align prime. Turn the pressure plates foot bar 1/4 turn and lift to remove. After opening the pressure plates, remove an replace the X tubing located around the top of the pump. Pull to fit the ends of the tubing into place. Close the pressure plates, reinsert the pressure plates, foot bar and turn 1/4 turn to lock in the pressure plates, press pause to restart the sampling system. Press F1, Prime salt bridge solution, press home on the touch screen to return to the operating menu. You can also access the operating menu screen by holding down the shift key and pressing. Exit the system automatically performs an IMT pump alignment and IMT calibration. Document the replacement on the monthly maintenance log sheet.

Priming Salt Bridge Soluti( Supplies QC SN3W31S Calib Alert Fl: PRIME SALT F4: SYSTEM PREP F3: ALIGN/PRIME F3: ALIGN F3: WIT Exit Stop Run Enter Calibration has been scheduled. F8: SEGMENT STATUS F7: PRIME FLUSH F7: PUMP PRIME F7: IT CONFIG F5: PRIME STD A n: ENTER r-2: SAMPLE STATUS SAMPLE STATUS TEST RE RE PROCESS CTRL SYSTEM OLAGNC

  • monthly
  • maintenance