PEPconnect

Inspecting and Emptying the Dryer on the Atellica® IM Analyzer Video Version 1.25 and Below

This video provides instructions on how to perform the weekly maintenance task of inspecting and emptying the dryer on the Atellica® IM Analyzer.

SIEMEN 1.7.0 SIEMENS Build 1.7.o SIEMENS Build 1.2.0 Subsystems System Samples Inventory Calibration Patient Orders Worklist Maintenance Status Setup Schedule Seatup Status Report Logs Operator Diagnostics Logs Log Diagnostics Diagnostic Name About Data Restore PEPconnect Software Updates Copy Configuration PI -06 Failted Module: All Frequency: All Time: Next 24 hours Performed By: All cL-P1-06 DL-P1-07 cL-P1-D6 c-P1-06 Module All Module Activity Add Activity Scheduled Fri-14 Sat-15 Sat-15 Sat-15 Mon-17 Tue-18 Wed-19 Thu-20 Tue-18 Description Diagnostic Diagnostic Name Diagnostics Description Frequency All pp_lA-Ol 1M Autocheck 3:30 Mark as Completed Move all module cornponents to their primary positions. Move all module comnponents to their primary positions. All Initialize Module Move all module components to their primary positions. Time Next 24 hours Cleaning the Exterior of the Aspirate Probes Cleaning the Exterior of Rheagenirate Probes Clear TherrnalS Clear Therrnats Clear system thermal components following a thermal error that caused components to go offline. Clear system thermal components 10110wing a thermal error that caused components to go offline. N/A Clear Thermnals Clear Thermals Clear system thermal components following a thermal error that caused components to go o Performed BV All Performed By All Cleaning the Water Container Initialize Cuvgette Loader Move the incuvetten loader and the associated subsystem cornponents to their pnnwary pos•uaÉns. Return the reagent compartmert and the associated subsystems to the starting positions. Return the lumient lomeartmert and the associated subsystems to the starting positions. Procedure Details Reagent Loader Cuvette Loader Initialize Reagente Loader Return the reagent lompadter and the associated subsystems to the starting positions. Return the reagent lompadtert and the associated subsystems to the starting positions. Return the reagent loader and the associated subsystems to the starting positions. Search Text Enter the activity name. p p _lA-O I pp_lA-Ol Inspecting and Emptying the 1M Water Trap Prime Cuvettes Cuvette conveyor moves to fill the vertical cuvette chute with cuvettes_ Cuvette conveyor moves to fill the vertical cuvette chute with cuvettes. Cuvette Loader Empty all Reagent Packs Empty all Reagent Packs from system for troubleshooting purposes. Edit/View__ _ Edit,'View___ EditNiew___ Scheduled by Operator Move the incubatien ringer and the associated subsystem comnponents to their primary positions. Move the incuvetten loader and the associated subsystem cornponents to their prirnary positions. Move the cuvette loader and the associated subsystem cornponents to prirnary positrons. Incubation Ring Prime Cuvettes Cuvette conveyor moves to fill the vertical cuvette chute with cuvettes_ Cuvette conveyor moves to fill the \értical cuvette chute with cuvettes_ Scheduled Automatically Delete Inspecting and Emptying the Dryer Database Backup 4/20/2017 4/17/2017 3:30 4/18/2017 0:30 Scheduled by Service Scheduled by Operator Empty all the cuvettes forom the incubation ring. Empty all the cuvettes trorn the incubation ring. Empty all the cuvettes from the incubation ring. Empty Ring Luminometer DL-P1-07 DL-P1-07 Autocheck for DL 5/18/2017 TOO Empty and Fill Ring Simultaneously empty the cuvettes from the incubation ring and load the ring with new cuveltes. Simultaneously empty the cuvettes from the incubation ring and load the ring with new cuvettes. Failed Reagent Compartment Empty Ring Empty all the cuvettes from the incubation ring. Database: Optimizing Overdue Initialze Incubation Ring Initialize Incubation Ring Move the incubation nng and the associated subsystem components to their primary positions. Move the incubation ring and the associated subsystem components to their primary postttons. Move the incubation ringer and the associated subsystem comnponents to their primary postttons. Reagent Probes Reagent Probes1 Reagent Loader Empty' and Fill Ring Empty and Fill Ring Simultaneously empty the cuvettes from the incubation ring and load the ring with new cuvel Inprocess FROM Database: Archiving and Deleting 4/10/2017 Initialize Luminometer Initialize Reagent Coarer Sample Probe Initialize Incubation Ring Move the incuvetten loader and the associated subsystem comnponents to their primary positiors. Move the incubetton loader and the associated subsystem components to their primary positions. Move the incubatien ringer and the associated subsystem components to their primary' positions. Completed 4/13/2017 Initialize Reagent Compartment Tip Loader UI OPERATORDIAGNOSTICS SUBSYSTEM LUMINOMETER ACTIVITY DARKCOUNTWlTHCUVETTE8 UI OPERATORDIAGNOSTICS SUBSYSTEM LUMINOMETER ACTIVITY DARKCOUNT Not Performed_ Not Perform___ 1M Daikly Maintenance 4/20/2017 5:00 With Comments Wash Ring Status p p_lA-O I 5/18/2017 TOO Parameters VACUUM Module Covers Reagent Loader Reagent Probe 1 4/17/2017 3:30 5/17/2017 10:05 Enter Diagnostics State Exit Diagnostics State Turn Mechanics Off Add Activity _ _ Add Activity _ Set Warning___ Set Warning__ PEP LabManager Thursday, June 08, 2017 AM Thursday. June 08. 2017 AM Thursday, June 08, 2017 1 AM

  • attelica
  • attellica
  • atelica