PEPconnect

Performing CH Daily Maintenance on the Atellica® CH Analyzer Video Version 1.25 and Below

This video provides instructions on how to perform the daily maintenance task of CH Daily Maintenance on the Atellica® CH Analyzer.

During the automated daily maintenance activity for the Atellica Ch analyzer, the system performs a series of cleaning and rinsing operations to decontaminate the analyzer. This activity will be run automatically on a daily basis, but can be run on demand as needed. To perform daily maintenance, manually ensure the analyzer is ready processing or standby state by selecting system in the command bar. Next select status. Select the Ch module. Finally, review the status of the analyzer. To ensure the waterbath additive is on board, select inventory in the command bar. Next, select reagent overview to verify that water bath additive is on board. Next, select the maintenance tab. Select schedule. Select the module from the dropdown menu. Select Ch daily maintenance. Select perform. Then select yes, wait for maintenance to complete, which should take 10 to 40 minutes to perform. This completes the overview of performing Ch daily maintenance.

Atellicae Solution Version 1.14.0.2975003 SIEMENS . Atellica Solution Version 1.14.0.2975003 Atellicae Solution Version 1. sp00107 14.0.2983003 14.0.29?3003 HeoLtnineers Healthineers SIEMENS . Healthineers I ry In ventory Reagent Needis Reagent Loader Reagent Overview Reagent Loader Operator Diagnostics R Needs Reagent Needs Reagent Loader S Overview Reagent Lot Comparison Cal-QC Storage Needs SH 1M 11 System Module Reagents Module Activity Scheduled Reagent Overview Reagent Details Reagent Needis Reagent Loader Reagent Needs sun-09 Onboard Calibration calibration cal Type Cal Type QC QC Srequence Frequency Analyzer In ventory Sequence Srequence cal Eligibility Calfibrmation Interval In Use Standby Standby All Tine TSHWUL TSHWL 110 007782 CFI .03 Not Penorm. _ Not Penomm„ All Capabilities p 102 003416 Odi.O'h C.P1.03 40] Procedure To an activity, Searcn c-P1-os 00657 / 00657 Odi.Oh 21dOh 42d22h • —The maintenance Daily Maihtenancefrequires The maintenance activity CH Daily Maintenance requires c-P1-os 13d22h 00688 00683 Lot and Pack 40 minutes. Perform this activity now? sc heduled Automatic Scheduled by Operator Scheduled by Service Sc heduled Automatic Connected to FCC 21 doh 21dOh 111391 4 d Oh Failed C.P1-05 c-P1-05 13d22h 125d13h 121dO3h 42d22h 00368 00224 00688 00683 Odi.Oh Odi.O'h OVerdue In process Inprocess 00692 00364 00688 00683 00368 00224 Yes No c-P1-03 c-P1-05 Completed 125 d 13 h 125d13h 007152 007782 Front Cover Not Performed Not Penorm. _ CH Clearing Cuvettes CH Cleanng Cuvettes As Needed Back Cover Front Cover With Comments WIth Comments aRAVMA Clean Reagent Loader Reagent Loader Reagent Oeraiew As Nee&ed c-P1-03 c-P1-03 c-P1-05 Clean Svstem FIOds Drawer Clean Svstem Fluids Drawe As Needed Group by reagent PEP rl 40 PEP PE LabManager Wedneday, 2018 10:31 AM Wedne;day. 17, 2018 1026 AM 2018 10:31 AM Tuesday, July 10.2018 Tuesday, July 10.2018 1127:30AM Tuesday, July 10.2018 AM

  • attelica
  • attellica
  • atelica