PEPconnect

Sysmex UF-1000i™ Urine Cell Analyzer Other Maintenance Practical Exercise

Perform monthly maintenance. Perform the as needed maintenance tasks. Describe reagent management. This clinical laboratory training qualifies for continuing education units (CEU).

  • clini
  • sysmex uf-1000i
  • uf1000i
  • sysmex
  • uf100i
  • shutdown
  • check vacuum trap
  • clean SRV
  • sample rotor valve
  • replace sample silter
  • adjust vacuum
  • adjust pressure
  • reagent
  • clinical laboratory training