PEPconnect

CLINITEK Novus® Analyzer Performing Quality Control Video

This video provides instructions on how to perform quality control on the CLINITEK Novus® Analyzer.

This is the screensaver screen. It will appear after 10 to 30 minutes of idle time. This time is set up during installation of the system. Just touch the screen and the home screen will appear. The information displayed on the home screen is important to review before starting a control, run. The status log does not appear as there are no errors or warnings. There's enough rinse to do a control run. The liquid waste container has enough room for a QC run. The card waste drawer does not indicate full. There are enough strips to do a QC run will be running 2 controls, one positive and one negative. To do a control run, select the system button. Select control. If the system access has been enabled with a prompt for an operator ID, this screen. Will appear requiring the operator to input his or her initials for. This demonstration will use JJ for the operator initials. After entering the initials of the operator, select enter. Following the instructions on the screen, select an enable option for each control lot that you want to use. To change a lot number or add a lot number select change for the control that you enabled. If everything is OK, select next. Follow the instructions on the screen. After placing the rack of controls on the rack handler, select start to begin the run. The analyzer updates the progress of the run. The first control is being aspirated a sequence number with the prefix C is assigned to all controls. This is the 12th control run on this instrument. Now the second control is being sampled. The first control is done. The second control is done. If control comments have been enabled, there's an opportunity to input comments. Otherwise this screen will not be seen by selecting the forward arrow button. We can enter comments for Control 2. This screen is for comments for Control 2. The control run is complete.

System > Control Record 1/2 System > Control Record 2/2 SIEMENS CLINITEK Novus 11:24 AM 06/01/2012 11:21 AM 06/01/2012 Status: Ready Status: Processing System > Control Select Control Home Done Syste m 11 21 AM 06/01/2012 11:24 AM 06/01/2012 11:21 AM 06/01/2012 11:22 AM 06/01/2012 Enter the control comments. Congratulations. You have completed this The control test is in process. The cont:rol test is in process. The system is processing the final samples. Select up to 3 control lots. To change a control lot, select the Change button next to 1. Place the control solutions in the rack. Seq. No. c-00012 c-000012 s-000012 c-00013 exercise. Select the X in the upper-right Tests Remaining Calibration Diagnostics the lot you want to change. To continue, select Next. Rack Number TLbe Number corner to close the window and continue. 10 Test TLbe Number Cassette Lot On-bard Stability Onbard Stability Or-bard Stability Control 14 Days ystem Management Next Sample 0-00239 Seq. No. Status Control 1 control Position 1 s-00001 s-000012 s-000013 System > Control Select Control Co mpleted c-000013 c-000012 s-00001 Clean SG well \bout the System Tests Remaining 325 324 Cancel Chancel Comment 1 Comment 2 Enable Co Sted c-00012 Type Lot c-00012 s-000012 2. Place the rack on the right side of the rack handler , with the open side of each Prime Pump Rack Number TLbe Number Tube Number tube slot in the rack facing toward the system. Cancel TLbe Number Tube Number Number Change 2 Cancel Chancel 3. Tilt the rack at an angle to the right, and align the rack slot on the bottom, right Semens POS POOS6028G Load & Unload side of the rack, sliding it into the retaining rail. 4. Push the rack to the right to align it along the retaining rail. Change 2 Changel2 5. To begin the control test, select Start control Control 2 Cancel Change 3 Changel Chancel Start Startus Next Done Don System Setup Results Start

  • video
  • qc